Boiler house Level controls
2
Directives and standards VdTÜV Bulletin "Wasserüberwachung 100" (Water Monitoring 100)
The functional unit consisting of the operating & display unit BHD50, blowdown controller BCR3250 and conductivity probes CP10, CP30/CP40 and CP32/CP42 are type approved according to VdTÜV Bulletin "Wasserüberwachung (Water Monitoring) 100". The VdTÜV Bulletin "Water Monitoring 100" states the requirements made on water monitoring equipment. Type approval no. TÜV · WR · XX-XXX (see name plate). LV (Low Voltage) Directive and EMC (Electromagnetic Compatibility) The equipment meets the requirements of the Low Voltage Directive 2014/35/EU and the EMC Directive 2014/30/EU. ATEX (Atmosphère Explosible) According to the European Directive 2014/34/EU the equipment must not be used in explosion risk areas.
2.3 61
Dimensions (BCR3250) (approximate) in mm
100
120
1
4
3
74
2
Item 1
Upper terminal strip Lower terminal strip
2 3 4
Housing
Support rail TH 35, EN 60715
The blowdown controller BCR3250 is clipped onto the support rail type TH 35, EN 60715 in the control cabinet, see item 4.
TI-P693-21 EMM Issue 1
Page 3 of 5
BCR3250 BHD50 Blowdown Controller Operating and Display Unit
Powered by FlippingBook