Product Handbook 2026 - Volume 1

Boiler house Blowdown vessels

2

Vent head with internal separator removes moisture from the steam.

Lifting lugs for safe positioning of vessel on site.

2.9 3

Inlet number 3 for level control chamber or TDS blowdown.

Pressure gauge and 'U' syphon for monitoring operation.

Inlet number 2 for discharges from automatic TDS control system or level control chamber/gauge glass blowdown. DCV2 Check valve control M21S2 Ball valve

Outlet to drain maintains internal standing water level to cool incoming blowdown.

Oval inspection opening

Cooling water system for applications where blowdown is very frequent.

Line drain valves for emptying a shutdown boiler.

Note: BDV60/6, BDV60/8 and BDV60/10 have two inspection openings - see page 6.

Inlet number 1 for main blowdown from the bottom of the boiler only.

Vessel drain valve for clearing sludge from the blowdown vessel.

This is only a representation of a possible set-up, the product may have 3 or 4 legs and the inspection port may be different on the product.

TI-P405-33 EMM Issue 9

Page 3 of 7

BDV60 Blowdown Vessels

Powered by