Product Handbook 2026 - Volume 2

Condensate pumps Electric pumps

9

Inlet and outlet connection and weights (approximate in kg)

V

W

X

Y

Z

CRU 200

Connections

Weight

Outlet

Overflow Vent

Inlet

Inlet

CRU200-2D-CME33-VSD-SS

DN25

DN80

DN100

DN50

DN50

TBA

PN16

CRU200-4D-CME102-VSD-SS

DN40

DN80

DN100

DN50

DN50

TBA

CRU 500

CRU500-4D-CME102-VSD-SS CRU500-5D-CME151-VSD-SS CRU500-5D-CME152-VSD-SS

DN40

DN80

DN100

DN80

DN80

TBA

PN16

DN50

DN80

DN100

DN80

DN80

TBA

DN50

DN80

DN100

DN80

DN80

TBA

Z

X

Y

W

V

V

9.2 10

Nozzle Loading It is the customers responsibility to support piping connected to this unit. To ensure no additional loads are placed on the connection nozzles. Vent pipework sizing Consideration should be given to increasing the Vent Pipework from the receiver to prevent excessive back pressure and loss of the Overflow water seal. This is particularly important where the Vent Pipe run is longer than 10 m, has more than two elbows in the run or where there is known to be a substantial amount of Flash Steam in the condensate return pipework to the receiver. Based on a 10 m equivalent length (including fittings) Vent Pipe capacities are shown in the table opposite

Flash Steam up to (kg/hr)

Vent Pipework nb (mm)

150 200 400 500

80

100 125 150 200 250

1000 1500

TI-P681-12 CMGT Issue 2

Page 4 of 6

CRU 200 and 500 Series Condensate Recovery Units (VSD pumps)

Powered by